Well just a quick update on the progress of the home we are building for the 2008 Central Oklahoma Parade of Homes in the beautiful Stone Mill subdivision in Yukon, Ok. The brick contractors finished up all masonry work on the exterior this week. The beautiful custom built entry door out of White Oak and distressed has been installed and I must say it does make a statement. You will see what I mean when I get some photos uploaded. Our in house carpentry crew built some wood beams to go up in a step up ceiling in the living room that matches the front door. They have a real nice rustic feel about them. The drywall crew came in this last week and installed all the sheetrock. The tape and bead contractor is now in there and will be texturing the walls with a hand troweled texture on all walls and ceilings. I have got all shop drawings made for the cabinets and built ins and my brother and myself went over and made all field measurements so we could start the construction of the cabinets. The kitchen cabinets we have chose to build those all the way up to the 10′ ceiling height doing a set of glass doors along the top with some nice architectural carvings placed in some highlighted areas. We will be doing flush inset cabinet doors with a beaded edge giving us a real nice look. The tile contractor will be in at the job site in about a week to start laying the floor tile. Stay tuned for more updated information.
Parade home update
Well this past week we finished all the electrical wiring, heat air duct work, all structured wiring is in place. We received all of our next round of inspections and I must say a lot of builders dread this stage of construction because of what the inspectors can do to you as far as holding up progress, but I must say our city inspectors here are some of the finest guys I have worked with and they are always willing to work with you on timing. The rock layers got in this week and laid the dry stack stone on the front entry and it sure has a nice look to it. We are heading in the direction of an Old World look and the style of stone fits right into this. The brick masons started laying the brick also this week and will wrap it up by mid week. The insulators came in and insulated the walls using the BIB system. This really does make for an efficient home. My wife, also our in house decorator has selected all the tile as well as the countertops and I am anxious to see all these materials come together. I have begun to really concentrate on the interior cabinet and trim designs as I have completed several drawings to start this process. As we have stated earlier and also in our “about us” area of our website we have our own in house trim and cabinet crew and we are a well polished team as many of our happy clients will testify to that. Woodwork is our speciality and we certainly get a lot of enjoyment and satisfaction out of taking raw wood and turning it into something beautiful for our customers. The drywall crew is set to arrive this week and to me and I am sure many of you this is when a house takes on a definite shape and look inside. It is at this time you can really tell your room sizes and the space that you will have. Progress is going well so come on out and see us.
-
Archives
- September 2008 (1)
- August 2008 (1)
- July 2008 (2)
- June 2008 (8)
- May 2008 (7)
- April 2008 (3)
- March 2008 (5)
- February 2008 (3)
- January 2008 (5)
- December 2007 (5)
- November 2007 (1)
-
Categories
-
RSS
Entries RSS
Comments RSS