Parade home update
Well this past week we finished all the electrical wiring, heat air duct work, all structured wiring is in place. We received all of our next round of inspections and I must say a lot of builders dread this stage of construction because of what the inspectors can do to you as far as holding up progress, but I must say our city inspectors here are some of the finest guys I have worked with and they are always willing to work with you on timing. The rock layers got in this week and laid the dry stack stone on the front entry and it sure has a nice look to it. We are heading in the direction of an Old World look and the style of stone fits right into this. The brick masons started laying the brick also this week and will wrap it up by mid week. The insulators came in and insulated the walls using the BIB system. This really does make for an efficient home. My wife, also our in house decorator has selected all the tile as well as the countertops and I am anxious to see all these materials come together. I have begun to really concentrate on the interior cabinet and trim designs as I have completed several drawings to start this process. As we have stated earlier and also in our “about us” area of our website we have our own in house trim and cabinet crew and we are a well polished team as many of our happy clients will testify to that. Woodwork is our speciality and we certainly get a lot of enjoyment and satisfaction out of taking raw wood and turning it into something beautiful for our customers. The drywall crew is set to arrive this week and to me and I am sure many of you this is when a house takes on a definite shape and look inside. It is at this time you can really tell your room sizes and the space that you will have. Progress is going well so come on out and see us.
Spring time
Well I think spring has finally sprung here in the central part of Oklahoma that is. The grass is beginning to green up the trees and landscaping are coming out of hibernation and things are starting to look real good. I really like when all the Bradford pear trees bloom out as this is one of my favorites. I am seeing people out in their yards and bed areas working them over. This is a great time of year. Well a little bit of update on the show home we are constructing in the beautiful Stone Mill subdivision in Yukon Oklahoma, on Thursday of last week the framing crew showed up and started laying out where the walls will go. This sounds probably trivial but it is at this stage right here where you house gets squared up so that they are level and in correct relation with each other. If a framer lays out the walls out of square it makes the sheetrock stage hard to do, it will make tile floors grout lines not be parallel with the walls in other words nothing good will take place. I find as a contractor this is a great time to spend at the job site because some times walls have to be shifted a little bit to make a plumbing line work properly or maybe make cabinets and trim fit into corners like they should. After walls are chalked out on the slab the framers go to work putting down the 2 x 4 sill plate and we like to use liquid nail under all the sill plates for a good bond to the slab. By the end of the day of Friday about 2/3’s of the walls were framed up with window and door openings in them. This next week I will be meeting with my cast stone contractor and we will be discussing cast stone mantles, hood surrounds and some details possibly for the exterior fascade. The framers will continue on with the walls and on up from there. Brick will be ordered this week and the windows are on order. We will continue to press on from here.
-
Archives
- September 2008 (1)
- August 2008 (1)
- July 2008 (2)
- June 2008 (8)
- May 2008 (7)
- April 2008 (3)
- March 2008 (5)
- February 2008 (3)
- January 2008 (5)
- December 2007 (5)
- November 2007 (1)
-
Categories
-
RSS
Entries RSS
Comments RSS