Update on parade home
We are coming down the home stretch on the finish of our parade home. The painting contractors will be applying some specialty wall glazes and finishes this next week. It will be time for several contractors to come in and finish up there last part. We built the cabinet frame on the outdoor patio/living area that will have the built in grill, refrigerator and sink in it. The tile contractor has tile the floor on the outdoor living area as this room is really going to be special for someone to enjoy. We have had a sudden rash of heavy rain here in central Oklahoma in the middle of August which is very abnormal for those of you that are not from this part of the country. It typically is hot and dry. So the rain has been a welcome site, however it has halted our progress on the exterior sodding of the yard as well as installation of the landscape. The landscape designer that we use has a plan all drafted up and ready to implement it as soon as the weather drys and around here that should be back pretty soon. So the next couple weeks will be hectic but fun. We believe we have secured a deal with a furniture and home furnishing store to stage the house with furnishings and we are looking forward to that. The actual start date of the parade of homes is September 13th so we have lots to do before that date but we look forward to meeting any of you that have been reading the progression schedule and want to come out to have a look.
1 Comment »
Leave a comment
-
Archives
- September 2008 (1)
- August 2008 (1)
- July 2008 (2)
- June 2008 (8)
- May 2008 (7)
- April 2008 (3)
- March 2008 (5)
- February 2008 (3)
- January 2008 (5)
- December 2007 (5)
- November 2007 (1)
-
Categories
-
RSS
Entries RSS
Comments RSS
Thanks for the update, I love visiting the parade of homes. I’ve been looking to move for a couple of years ago, and I almost buy a house everytime I go to the parade.